Preparatory phase of the project on trypanosomiasis control in the Kagera basin (RAF/87/132)

View
Download
Published
1988-09Author(s)/Corporate Author (s)
United Nations. Economic Commission for Africa.;Metadata
Show full item recordAbstract
The meeting on the review of the work plan and the implementation Schedule of the preparatory phase of the Project on Trypanosomiasis Control in the Kagera Basin was held from 8 to 9 June 1988 at the Headquarters of the International Centre of Insect Physiology and Ecology (ICIPE), Nairobi, Kenya. The meeting was organized as requested by the Kagera Basin Organization (KBO) in conformity with the Project document and the work Programme of the Joint ECA/FAO Agriculture Division (JEFAD) (Programme element 2.4 (Operational activities)).
Citation
“United Nations. Economic Commission for Africa. (1988-09). Preparatory phase of the project on trypanosomiasis control in the Kagera basin (RAF/87/132). UN. ECA Meeting on the Review of the Work Plan and Implementation Schedule of the Project on Trypanosomiasis Control in the Kagera Basin (1988, Jun. 8-9: Nairobi, Kenya). Addis Ababa:. © UN. ECA,. https://hdl.handle.net/10855/33385”Conference
UN. ECA Meeting on the Review of the Work Plan and Implementation Schedule of the Project on Trypanosomiasis Control in the Kagera Basin (1988, Jun. 8-9: Nairobi, Kenya)Collections
- Agriculture [3027]
- All Conferences [5793]
- Social Development [6618]