Programme of Activities for the Implementation of the Preparatory Phase (1982-1984) of IDDA

View
Download
Published
1982-09Author(s)/Corporate Author (s)
United Nations. Economic Commission for Africa;Metadata
Show full item recordAbstract
Some of the major project areas in this sub sector are in the production of machine tools and metal-working equipment? Cutting tools; jigs, tools and fixtures for tool rooms; foundry and forging equipments. In the short-term, the raw material inputs could be obtained through long-term purchase agreements from African countries with iron and steel, such as Algeria, Egypt, Nigeria and Zimbabwe and ports from the rest or the world. More iron and steel projects; are proposed for the long-term period. In those cases where national markets are too small, sub regional and multi-country projects are proposed.
Citation
“United Nations. Economic Commission for Africa (1982-09). Programme of Activities for the Implementation of the Preparatory Phase (1982-1984) of IDDA. UN. ECA Follow-up Committee on Industrialization in Africa Meeting ( 7th : 1982 Nov. 24 - 27 : Kigali, Rwanda.). Addis Ababa :. © UN. ECA,. https://hdl.handle.net/10855/14302”Conference
UN. ECA Follow-up Committee on Industrialization in Africa Meeting ( 7th : 1982 Nov. 24 - 27 : Kigali, Rwanda.)Collections
- Agriculture [2925]
- Industrialization [3358]
- Organizational Management [4894]